Project details
Project name: Boz-Uchuk Hydropower Project
Project location: Boz-Uchuk River, Ak-Suu district, Issyk-Kul region, Kyrgyzstan
Installed capacity: 5.4 MW
Project owner: Ananyevo GES LLC
HSS Assessment
Assessment tool: Hydropower Sustainability Standard
Assessment stage: Operation
Assessment date: 15-18 June, 2026
HSS Assessment Report:
Public Consultation Form
Assessor team
Sustainability assessment overview
The assessment finds that the Boz-Uchuk HPP has an overall positive sustainability performance, with small, well-managed environmental and social impacts and no physical displacement. A newly developed ESMP, supported by appropriate staffing and funding, provides the framework for monitoring residual impacts, managing biodiversity issues (including environmental flows and compensatory reforestation for lost protected forest), and addressing infrastructure safety and emergency preparedness. Water quality, erosion and sedimentation impacts are minimal given the limited sediment transport on the river, and flow releases in the bypass reach show no adverse ecological or social effects.
The project maintains good community relations through local employment, support to local institutions and infrastructure, and constructive stakeholder engagement, with communication arrangements being upgraded through the ESMP and SEP. Governance and procurement are clearly assigned and appropriately scaled to the operational phase. Identified opportunities for improvement include routine disclosure of community agreements and benefits, demonstrating emergency preparedness implementation, and completing public safety measures such as fencing and signage during site rehabilitation.
The public consultation period on the Preliminary Assessment Report of the
Boz-Uchuk Hydropower Project is open from 12 October to 10 December 2026.